Project: Cambridgeshire
- map of projects
Operator: Summerleaze Location: Cambridge Research Park, Cambridge, CB5 9PG
Information
This is a small 300m 3 digester, used for research and testing purposes. Summerleaze are currently studying the biogas potential of energy crops, with a view to using dairy and abattoir wastes in future.
The scale of this plant makes it possible to carefully control the system parameters and feeding rates to get accurate figures for gas production and biological activity. Once CHP is installed on the site the electricity will be used to generate renewable Hydrogen from an on-site electrolysis unit.
Summerleaze An-digestion